EVALUASI KINERJA WAKTU DAN BIAYA PADA PROYEK WU TOWER BANDUNG

Authors

  • Bagus Krido Utomo Universitas Sangga Buana
  • Dody Kusmana Universitas Sangga Buana

DOI:

https://doi.org/10.32897/simteks.v4i2.3947

Keywords:

Cost and time, Acceleration, Time Cost Trade Off

Abstract

The research evaluates the time and cost performance of the Wu Tower Project in Bandung using the Earned Value (EV) method. The scope of the research includes a comprehensive literature study on the concept of Earned Value (EV) and its application in the evaluation of time and cost performance of construction projects. In addition, the research also includes the measurement of the actual time and cost performance of the Wu Tower Project using the EV method, analysis of influencing factors, especially those related to design complexity, scope changes, and labor, as well as comparison of actual time and cost performance with predetermined standards. The performance of the project implementation time in the 1st month (one) to the 8th month (eight) is progressing well as indicated by the SV (Schedule Variant) variant value is positive or the SPI performance index ≥ 1, this indicates that the work is progressing both in schedule and budget. For the 9th (ninth) to 11th (eleventh) month, the SV (Schedule Variant) value is negative, which means that the work is delayed, but the project completion expenditure budget is still quite efficient because the SPI value is ≥ 1. Based on the Performance Index value, the overall SPI value gets an average value of 1.73, which means that the project is progressing towards time performance, while the CPI value generally gets an average SPI value ≥ 1, which means that the costs incurred are more economical, so that the project is more efficient.

References

I. Kartini Et Al., Manajemen Proyek. Cendikia Mulia Mandiri, 2022.

R. Belferik Et Al., Manajemen Proyek: Teori & Penerapannya. Pt. Sonpedia Publishing Indonesia, 2023.

E. Saraswati, A. Ghofar, And I. S. E. Maghfiroh, Akuntansi Manajemen Strategis. Universitas Brawijaya Press, 2021.

A. E. Pertiwi, “Evaluasi Pengendalian Waktu Pada Proyek Pembangunan Gedung Rawat Inap 3 Dan 4 Rsud Suradadi Menggunakan Earned Value Concept (The Evaluation Of Time Control On The Development Project Of Inpatient Building 3 And 4 In Hospital Suradadi Using Earned Value Concept),” 2018.

I. A. P. S. Mahapatni, “Metode Perencanaan Dan Pengendalian Proyek Konstruksi,” 2019, Unhi Press.

A. A. Azwar, “Analisis Pengendalian Biaya Dan Waktu Menggunakan Metode Earned Value Concept Dan Earned Schedule (Studi Kasus: Proyek Rehabilitas/Pemeliharaan Jalan (Dak) Peningkatan Jalan Dadapan, Pringkuku, Pacitan, Jawa Timur),” 2021.

N. Maulidi, M. Huda, And H. T. Tjendani, “Analisis Biaya Dan Waktu Pada Pembangunan Gedung Trauma Center Dan Intensive Care Tahap Iv Rsud Dr. Soedono Madiun Dengan Metode Earned Value,” Jurnal Spesialis Teknik Sipil, Vol. 2, No. 2, 2021.

A. E. Pertiwi, “Evaluasi Pengendalian Waktu Pada Proyek Pembangunan Gedung Rawat Inap 3 Dan 4 Rsud Suradadi Menggunakan Earned Value Concept (The Evaluation Of Time Control On The Development Project Of Inpatient Building 3 And 4 In Hospital Suradadi Using Earned Value Concept),” 2018.

Additional Files

Published

2024-09-30